On a glorious Easter bank holiday Friday morning Robert and I tried a bit of 'Guerilla Gardening' at our connect-2 Portrait Bench. With a bounty of plants nurtured by our 'green-fingered' leader, a bit of compost and a willing workhorse (me!) we set about transformed the site around the bench overlooking the lake at Albert village into something more attractive and interesting. If I remember rightly we were planting foxgloves, aquaphilia(?) and er what was it ah yes 'forget-me-nots'! We also spread some poppy and wild flower seeds in the hope that in the coming months the site will bloom.
Thanks go to Robert for his hard work and generosity in providing the plants. We propose to enhance the site further by repairing the fencing, replacing broken posts and providing a 'bike rack' with pieces of timber purloined from James and the maintenance team in Derby. We hope you can join us on our follow-up workday in a couple of months time lending a hand with the 'fencing' and tending or adding to our garden in the wild!
Friday, 18 April 2014
Friday, 5 April 2013
27/03/2013 - NCN52 Signing trip - Nuneaton
At 6:30 on this morning, my partner, Jean, dropped me off at Higham on the
Hill, before taking the kids to the childminder and going to work. It started
to SNOW! Panniers, rackbag and handlebar bag fitted rucksack on and ready to
go. I set off, replacing a couple of signs on Wood St then trundled off down to
the A5 & Nuneaton.
A right, then a left into the underpass onto the Weddington
Country Walk and STOP. The local skateboarders had left all of their stunt
ramps cluttering the underpass. One of their rigs was blocking the whole width,
so I had to dismount and move it out of the way. (see photo) I replaced tired
or vandalised signs and added a few new reminder signs as I went. What is it
about Sandon Park Reccy, that our signs are torn down or damaged every-time I
inspect the route? I have tried to be a bit coy this time, putting my new sign
inside the H of a fence upright. Glad to say that Stoney Road & Midland
Road signs were still in good order.
I then tackled the Coventry canal, from Midland Road to
Triton Road. I had received views that there were not enough reminder signs and
that some directions were a little lacking in places. I attended to this matter
with a bit of creativity, using scissors and a permanent marker (for a
temporary solution).
I added a few new signs to simplify the route between the
Canal and Wembrook and make it more user-friendly. On the Wembrook Trail none
of the SUSTRANS signposts have all of their arms anymore, if any, I attended to
this matter by replacing them with Ranger signs where needed.
At about 10am I visited Ian to check that his kettle was in
working order. I think that the snow had put him off joining the venture, but
he did supply me with a good stock of signs
A few extra signs were required around the A444 central ring-road,
to simplify the route and make it easier to follow, in both directions.
This only left the A444 Weddington Road, between Leicester
Road and the Country walk to attend to. I rode out one way & back the
other, as each side of the road has its own cycle lane. I made sure that there
was a reminder sign at least every ¼ mile.
I finished my venture around 14:30, returning home via the
A47 and Hinckley. This was not without incident, as the photos of Barwell Lane
will testify.
When I got home, I reported the problems I had found on
various routes to the relevant authorities.
Warwickshire CC redirected me to Nuneaton & Bedworth BC,
who seemed less than enthusiastic, to clear the numerous pallets & other
wood from below the A5 Watling St/ Weddington Walk subway. This was despite the
fact of my warning that the amount of wood accumulated, could pose a serious
fire risk, under the A5, with significant possibility of structural damage.
A young gent from Leicestershire CC, highways and
maintenance, called me several times to keep me updated about the fallen trees
on Barwell Lane, Hinckley. The last time he called, was to let me know that his
crew had been out and felled 3 dangerous trees in all (I had only reported 2)
and that the pathway was now fully open and usable again. – Many thanks to
“Shiraz” I hope I have his name right, not only for getting the job done quick,
but also for excellent customer service.
Saturday, 8 December 2012
They don't make safety posters like these anymore!
Remember the : "Think once, think twice, THINKK BIKE!" ads - they applied to all two wheelers. Its just that the motorbikes would take away a chunk of car for the trouble. Those dented wings and doors that don't shut properly can serve as an expensive reminder to open your eyes.
Remember the : "Think once, think twice, THINKK BIKE!" ads - they applied to all two wheelers. Its just that the motorbikes would take away a chunk of car for the trouble. Those dented wings and doors that don't shut properly can serve as an expensive reminder to open your eyes.
Thursday, 21 June 2012
Drainage Work on Route 52.
On the morning of Friday the 15th of June, Robert
and I ventured out to a section of route 52 – so fortunately placed at his back
door – that he had wanted to work on because of it constantly collecting
rainwater flowing down the slope, - great for the plant life on both sides but
not so for path users. To aid it on its way down we dug through the grass on
the downward slope at key points, with the effect being noticeable almost right
away. Now the water drains much better, although it’s probable the makeshift
drainage ditches will soon be filled with vegetation, making this something to
be repeated on a fairly regular basis. Robert also cut back thorny plants such
as blackthorn and dogs rose that had begun to encroach on the path.
Once that was completed, we followed route 52 to Gracedieu
Priory so I could learn more about the route and Sustrans in general. The trail
seemed well managed, though just as it reaches the turn-off to the priory and
the end of the woodlands a tremendous rotten branch had snapped off an Ash
tree, presumably in the previous nights storm, taking with it a fair deal of
neighbouring Sycamore branches. Being too large to move and blocking the path
almost entirely, attempts were made to report it, - it will not be long before
removal.
All in all, a productive day and the route has been improved
somewhat. A crying shame, though, that the sporadic downpours were not avoided.
Tuesday, 5 June 2012
NCN52 Weddington Way – Inspection Ride
On 05th June 2012 I performed an inspection ride
of NCN52, between Higham-on-the-Hill and Attleborough, Nuneaton. The ride was
dual purpose; 1, to check the state of the Weddington Country Walk / Coventry
Canal off road section and 2, to perform a reconnaissance ride of the braided
section of the route that passes through the town centre. The latter was to
make recommendations for possible renumbering, as per current SUSTRANS practice
concerning split or braided routes.
My findings were as follows:
A.
The Weddington Country Walk (WCW) is overgrown
in two places:
1.
Weeds are crowding the path in places between
the A5 and A444.
2.
Where the path near Sandon Park becomes very
narrow, Hawthorne & Nettle are growing through the fence on both sides,
making riding quite hazardous
B.
There is a lot of damage to signage (see
photographs) along WCW thus:
1.
Reminder sign damaged at farm track over bridge
near A5.
2.
Damage to “Busy Road” warning sign near A444.
3.
Signs damaged or completely torn away at Sandon
Park.
4.
Graffiti over sign on Stoney Road.
5.
Signs damaged at entrance to Coventry Canal –
Midland Road.
C.
The Railtrack improvements and diversion of
railway lines, means that the Stoney Road area is in a state of constant flux
and will be for a considerable amount of time. This will cause requirement of
frequent updates to signage.
D.
There is very little signage along the Coventry
Canal in either direction, this requires rectification. Signs that are in place
are damaged or covered with graffiti.
E.
The signage of the “alternative” braided route, via
Nuneaton town centre is rather sporadic and ambiguous running in a Southwest
direction; running Northeast, some of the signing is almost non-existent.
F.
At Pingles Park (The Wem Brook Trail) the white “National
Cycle Network” direction signs (as shown in Photograph 6) have all suffered
damage, most missing at least 1 arm some having none.
I conclude that the on road route via Nuneaton town centre,
is possibly the more viable route to sign as route 52. I suggest that the route via Weddington Way,
Sandon Park, Stoney Road and the Coventry Canal could be renumbered as NCN (52) or (52A) or Regional Route
RCN (52) or (52A). This should
be applicable between where the route diverges at the A444 Weddington Road and
where it reconverges, with the Coventry Canal at the Shepperton Business Park.
This option will require less expenditure for replacement of signs.
I am prepared to perform some of these corrections, between Higham-on-the-Hill
and Shepperton Business Park, but I also think that the Nuneaton group should
have a chance to share in the improvements.
Kev Regester – West Leicestershire Ranger – NCN52 Weddington
Way
Freshairmiles - quality not quantity!
We ran two social rides out of Hinckley on the evenings of Monday 27th May and Mon 4th June. Our target audience was specifically a group of adults who had just completed cycle training courses run by Leicestershire Council. The idea was to provide a social activity and introduce them the local network of lanes so that they could try out their new skills in a safe environment.
I publicised the rides by turning up at two of their cycle training evenings, talking to them about Sustrans and the planned rides and also handing out contact details and flyers for the rides. There seemed to be a fair amount of interest albeit that there were probably only 10 or so regular participants. We did not publicise the rides any wider in fairness.
Unfortunately the interest did not translate into people turning up for the rides on what turned out to be two of the better evenings for weather. The weather for the first ride was glorious.
So we had just Tina along for the first ride and she was joined by Judy for the second ride. In the end the other planned ride leaders were "stood down" and I took the ladies out on my own. On the first night Tina was keen to go further so we extended the planned ride and did an extra loop out to Shenton station - probably 15 miles in total. The second night was a bit cooler so we contented ourselves with the planned loop out to Dadlington and Stoke Golding stopping for a well earned drink in the George and Dragon. The ladies said they enjoyed the rides and I certainly did. Both of them intend to continue with their cycling so thats great.
This is now our third year of running freshairmiles rides and we have still not cracked how to get joe public along. I am tempted to get myself trained as a Skyride leader next year and go down the skyrides local route - they have a bigger marketing budget than Sustrans!
Sunday, 22 April 2012
NCN524 Blaby to Higham-on-the-Hill – Test Ride
A few souls (with nothing better to do) met up in Blaby, at
0930 on Sunday 22nd April 2012. Our Objective: to test the viability
of this route, as a new part of the National Cycle Network, linking some parts
of South-West Leicestershire, that until now, had been overlooked.
Those Present:
James Lowe, Alan White, Eric Ludlow, Robert Robinson, Jack Riggal and Myself.
1. The gradient around Croft Hill, beat me, forcing me to get off and push, much to my shame, considering all of my counterparts managed it, several of them carrying more senior years than I.
2. Despite much cajoling and multiple pleas, Eric was adamant in his refusal to perform any stunts at the Watery Gate Lane ford, near Thurlaston. A missed opportunity methinks, especially considering an almost captive audience.
Grove Road & A426 – Blaby By-Pass Roundabout
i. Footpaths need upgrading to Share use Pedestrian & Cycle paths, all around the roundabout, to allow safe negotiation of junction by pedal cyclists.
2. Narborough
Coventry Road, B4114 – King Edward Ave & Huncote Road
i. Divert cyclists onto Northern pavement (upgraded to shared use) on Coventry Road, between Cedar Crescent and King Edward Ave.
ii. Upgrade Pelican Crossing to Toucan Crossing.
iii. Upgrade Western pavement of B4114 – King Edward Avenue to shared use Cycle/Footway, between Toucan Crossing & Huncote Road.
iv. Continue shared use Cycleway, into Huncote Road (on Northern pavement) until Just before car parking lay-by.
v. Install appropriate signage, on roads, pavements and posts, informing cyclists where to leave or rejoin main carriageway, at these alterations.
3. Hinckley
Barwell Lane, B4667 – Ashby Road & Barrie Road
i. B4667 – Ashby Road; Eastern pavement – Upgrade to shared use, between Barwell Lane & pedestrian crossing.
ii. Upgrade Pelican Crossing to Toucan Crossing.
iii. B4667 – Ashby Road; Western Pavement – Upgrade to shared use, Toucan crossing and Barrie Road.
iv. Install appropriate signage, on roads, pavements and posts, informing cyclists where to leave or rejoin main carriageway, at these alterations.
West Leics Sustrans Ranger
NCN52 (Weddington Way)
Those Present:
James Lowe, Alan White, Eric Ludlow, Robert Robinson, Jack Riggal and Myself.
I think that everyone enjoyed the ride and the general
consensus was that this was a good, viable route, to add to the network. The
weather stayed on our side for most of the way, only turning bad on us with a
brief downpour, near Wykin, close to our Journey’s end at Higham. Even then
Jack scared the weather into submission by donning his waterproofs.
The journey
went pretty much without incident, apart from maybe two points to mention:1. The gradient around Croft Hill, beat me, forcing me to get off and push, much to my shame, considering all of my counterparts managed it, several of them carrying more senior years than I.
2. Despite much cajoling and multiple pleas, Eric was adamant in his refusal to perform any stunts at the Watery Gate Lane ford, near Thurlaston. A missed opportunity methinks, especially considering an almost captive audience.
The trip was approximately 16½ miles, only slightly over my
estimate and took just less than 2½ hours. We did identify some areas that
require attention, as the route develops, listed thus:
Infrastructure Alteration Requirements
1. Whetstone / BlabyGrove Road & A426 – Blaby By-Pass Roundabout
i. Footpaths need upgrading to Share use Pedestrian & Cycle paths, all around the roundabout, to allow safe negotiation of junction by pedal cyclists.
2. Narborough
Coventry Road, B4114 – King Edward Ave & Huncote Road
i. Divert cyclists onto Northern pavement (upgraded to shared use) on Coventry Road, between Cedar Crescent and King Edward Ave.
ii. Upgrade Pelican Crossing to Toucan Crossing.
iii. Upgrade Western pavement of B4114 – King Edward Avenue to shared use Cycle/Footway, between Toucan Crossing & Huncote Road.
iv. Continue shared use Cycleway, into Huncote Road (on Northern pavement) until Just before car parking lay-by.
v. Install appropriate signage, on roads, pavements and posts, informing cyclists where to leave or rejoin main carriageway, at these alterations.
Barwell Lane, B4667 – Ashby Road & Barrie Road
i. B4667 – Ashby Road; Eastern pavement – Upgrade to shared use, between Barwell Lane & pedestrian crossing.
ii. Upgrade Pelican Crossing to Toucan Crossing.
iii. B4667 – Ashby Road; Western Pavement – Upgrade to shared use, Toucan crossing and Barrie Road.
iv. Install appropriate signage, on roads, pavements and posts, informing cyclists where to leave or rejoin main carriageway, at these alterations.
A very big thank-you to Alan, for providing refreshment and
an excellent chilli to round off a very pleasant day.
Kev RegesterWest Leics Sustrans Ranger
NCN52 (Weddington Way)
Sunday, 1 April 2012
Ride out to Loughborough
Sad I know, but I had been fascinated by the Loughborough Cycle map which shows a number of numbered cycle routes through and around the town. On a lovely spring day myself, Eric and Robert took a trip out to Leicester via NCN 63 and then NCN 6 north to Loughborough. A couple of problems following 63 which has quite a few twists and turns but we got there without any real problems. We then picked up NCN 6 which was more straightforward and has recently had some posh new signs.
Refreshment stops at the Abbey Park cafe and then a well earned pint at a canalside pub in Loughborough which went down very well.
From here we headed off in different directions for home - me a hilly ride through Charnwood fo
rest and Eric tried the towpath. Robert opted for NCN 6 / 52. Before we split Robert and I followed a part of Route 3 from the pub. This looks like a bit of a ring road around the town. Anyway it delivered me from the pub to the Uni where I picked up the road to Nanpantan The route was well signed and the cycle route was all on dedicated cycle paths by the side of the road.Bit tired by the time I got home, but a great day out.
Thursday, 29 March 2012
Sunday 25th March was a beautiful day for our workday on NCN Route 52 in Gracedieu woods in Thringstone, Leics. Our work party of 7 consisted of Eric, Shawn, Ben, Kev, myself (Robert), ably assisted by Jack (a new volunteer) and my son Alex. I arrived by car at about 10 15 am with a trailer full of wheelbarrows, spades, shovels and sweeping brushes, some of them had been borrowed from kind neighbours. I quickly set up notices informing the public that work was being done on the path.
As soon as the volunteers arrived we set about trying clear a section of an old railway cutting (originally the Nuneaton to Loughborough line) - about 230 metres need to be cleared of collected debris. This consisted of leaves which had by now composted down, an ideal growing ground for the blackberry bramble (the cyclist’s favourite bush - anyone who has caught one in the crook of their arm riding at speed knows why they are favourite!) In total we managed to clear about 150 metres, removing 100+ barrowloads of assorted debris - brambles, old bits of branches etc. We increased the narrow path back to a comfortable 2 - 3 metre width, finishing at 1.00pm - not a bad morning’s work.
I was pleased at this point to depart to a local hostelry as I was feeling somewhat tired and in need of refreshment; I don't know how those helpers who had cycled to Thringstone summoned up the energy to ride home, as they had already cycled in for about 1.5 hours. Kev - who had been transported by car to the work site and then unloaded his bike and trailer, intended to make the return journey by bike which apparently would take about 3 hours. Thanks very much to you all, a great effort and I am sure that this will be appreciated by all who use this route.
Footnote: several local residents commented on the day that they were pleased to see the clearing work being done, as this is a very popular section of route 52 and well used by both cyclist and walkers.
thanks again to all involved.
Robert ROBINSON Ranger on NCN 52, 6, 15 Coalville to Wilson
Reclaiming our streets

Inspired by campaigns such as Sustrans "Free Range Kids" and The Times Cycle Campaign I decided that 20mph speed limits were the answer for my own village of Stoke Golding. However as I started to dig around and talk to people the answer became less clear to me. I took a step back and thought about what I was trying to achieve. The answer to this was easier - I wanted streets where people could live, play and socialise rather than it being just a thoroughfare for cars. In short I wanted to hand back streets to the people who live there - but how to do it?
Traffic speeds are critical, but streets also need to look and feel like a "place" rather than a highway. This can become a virtuous circle as research shows that drivers will naturally slow when there are people about and when the street "tells" them they need to go slow. This is generally talked about as "natural" or "psychological" calming. Designed correctly you should not need lots of hard calming measures such as speed bumps. This is all very well for a new development, but harder to achieve for existing streets.

I took a trip out to have a proper look at the neighbouring village of Higham on the Hill which is a "home zone". This has been done very nicely - not too many signs, no speed bumps, but subtle changes in road colour and texture, narrowing of roads. Planters, benches and attractive bollards. All great, but a whooping price tag of £400,000!!
This set me talking to the DIY Streets team at Sustrans. Their premise is that there are effective changes that can be made to streets

at low cost. A build out here and there, some changes in road texture or colour or a planter or two. The key here is that some of these can be done by the community themselves. This keeps costs low and builds ownership. They passed on some very useful resources that give some principles for street design, and also some ideas for how you can enliven streets - a temporary or moveable street cafe or a street side art gallery for example. Anything that will bring the community out and allow them to reclaim their streets.
So whilst I haven't given up on 20mph limits, I now believe that they are not enough on their own. At best they will achieve a marginal reduction in speed, but that alone will not be enough to reclaim the streets.
So where do I go from here? Well I have a slot at the Annual Parish Meeting in late April where I am hoping that I can achieve buy in to the vision and get support from the Parish Council and community. What I would then like to do is:
- start properly campaigning for reduced speed limits in the village;
- pick a particular problem and get some changes implemented on the ground; I think this is key to building momentum and credibility
- get an streets design for the village identifying affordable changes (Sustrans DIY Streets team can do this)
As ever funding will be a challenge, but we can but try. I will keep you posted through the blog as this develops.
I have unearthed quite a few good resources during my research - get in touch if you are interested and I may be able to point you in the right direction. Equally if anybody out there has been there / done it I would love to hear from you.
Monday, 26 March 2012
Leicestershire Cycle Training
Leicestershire County Council are running adult cycle training courses again this year. There are courses in our patch at Hinckley, Barwell and Coalville. We are looking at how we can support the newly trained cyclists. More details here http://www.leics.gov.uk/adult_cycling_leaflet.pdf
National Cycle Network – Route 52 Signing Ride
Hi all, on 2nd January 2012, I took a trip out to
Nuneaton, to attend to the signing of a part of NCN52, under my care. My
partner Jean dropped me off, with my step son, George and our bikes, near the
junction of the Coventry Canal and Midland Road.
We had a lot of signing to take care of around the ramp
linking the Coventry Canal to Midland Road, especially following the route in a
South-West direction. There was no sign directing cyclists off of Midland Road,
and the addition of a sign with a “↙” arrow was needed to clarify “doubling back”
onto the tow path, at the bottom of the ramp, in order to follow the route.
The signs exiting the canal (travelling NE) were a little clearer,
but I placed the arrow pointing up the ramp, for clarification. Again there was
no signing at the top of the ramp, indicating a left turn onto Midland Road.
This may seem like a dense placement of signage in a small
area, but at the same time, much needed to avoid confusion and ambiguity. Yes
over-signing can lead to confusion, but it is far better than undersigning or
non-signing which leaves everyone lost. The first time I rode this route, even
armed with a map, I gave up at this point. I was back at home looking on google
satellite & street view, before I discovered where the route went.
+SW+-+Stoney+Road+-+Midland+Road.jpg)
My advice – Imagine you are directing a stranger (to the
area) along your route. If you have ridden for a while and there has been no
sign, place a confirmation sign. It is reassuring that you are still on the
right track. There is nothing worse than the feeling “Have I taken a wrong
turn?”
+NE+-+Stoney+Road.jpg)
Our next area of concern was Stoney Road. Exiting right onto
Midland Road needed a replacement sign, for a damaged one. Further along
Network Rail are doing some track alterations and demolishing a bridge, new
signs were required to follow the now diverted course of Stoney Road.
We then set off along our off-road travels, along the
Weddington Country Walk, pausing to place a 52 sticker that was missing. George
and I erected a couple of Safety Signs where our route crossed the main A444,
Weddington Road.
The last 3 signs were placed in Higham-on-the-Hill, to help
allay confusion, or to confirm the route. My other half then collected us at a
farm entrance, off Stoke Road, helping us hang our bikes on the back of the
car, before setting off home.
A cold but pleasant way to spend the first bank holiday of
the year; we have made a photo diary of our efforts, just to keep a record.
There are no “before” shots, as a blank fence or post would present you with
little interest.
Kev Regester – Ranger NCN52 (Weddington Country Walk)
Tuesday, 15 November 2011
NCN 524 Nuneaton / Tamworth - we have a route
I went out with Sustrans area manager Ed Healey yesterday and we rode the proposed route for NCN 524 from Nuneaton to Tamworth and its looking good. The proposed route is here http://ridewithgps.com/routes/818820.
It took us a while to figure out the best way out of Nuneaton station but in the end we settled on the south of the ringway heading clockwise. Marginally long than the anticlockwise route, but cycle paths and crossings are good and there are plenty of places to hang signs.
Once off the ring road, the minor roads worked pretty well. A little disappointing that the bridge where we cross NCN52 does not have good access to the towpath (quite a few steps). However there are reasonable links to the next bridge where access is better. Whittleford Park (pictured) worked OK although surface was not great in places and we still have to find the best exit place from the park near Bucks Hill. Places to stick signs also look a little limited.
Once on the North Warwickshire cycle way its all pretty straightforward although we are planning to deviate from it for a short while as we think we have found a better route. After the bridleway at the end of Ridge Lane we propose to take the first left which gets us off the fast B4116 Coleshill Road sooner. We rejoin the North Warwickshire cycleway just west of Baxterley.
From here the route through Wood End is fine (a bit hilly) and the lanes through Whateley are very pretty. Once we are in Tamworth its cycle paths all the way - all with good road crossings. We choose a route to the west through Dosthill, the river and along Peelers Way. This seems to give a good balance of speed, ease of signing and safety.
So there are a few details left to iron out. Ed needs to get sign on from the councils. We then need to to a detailed signing survey (what signs do we need, where can we stick them?) before finding some willing volunteers to do the signing.
Sunday, 23 October 2011
East Midlands Region Group Coordinator Meeting
On Sat 22nd Oct ,Group Coordinators from the East Midlands met up in Derby. Les Sims who hosted the meeting has produced some notes, but there were a few other points I thought it would be useful to feedback.
Derby Cycling.
Derby has some great cycle routes. Coming from the south it was an easy (albeit quite long) ride to get to our meeting place at Derby station. Signing was very good with lots of traffic free routes right into the town centre. For a pre-meeting ride we cycled out to Etwell along NCN 54 much along an old railway track. At Etwell the route joins NCN 68 the Pennine Cycleway which will take you a hilly 355 miles to Berwick! It was only fairly recently that I became fully aware of the extent of this route. A well kept secret.
Meeting Points
CycleNation
Simon Geller who is the secretary for CycleNation gave some feedback on their recent annual conference in Sheffield. I must admit I had not heard of them before. They are an umbrella organisation for regional campaigning groups. You might want to check them out http://www.cyclenation.org.uk/index.php
Freshairmiles rides
I think there is a general problem in recruiting people onto rides - particularly novice riders. The key learning points from the discussion seemed to be:
- do something other than just a cycle ride - e.g a historical tour
- talk about time rather than mileage
- aa series of rides rather than a one off
FreeRange Kids
Dave Stevens from Sustrans outlined this campaign. It brings together a number of initiatives Sustrans has been doing for a while - "safe routes to schools", "diy streets", "bike it". There was a discussion about how ranger groups can support the campaign. There seemed to be a mixture of top down actions (e.g. policy and campaigning) and bottom up - lobby for a particular local issue (e.g. a cycle path to a local school).
Derby Cycling.
Derby has some great cycle routes. Coming from the south it was an easy (albeit quite long) ride to get to our meeting place at Derby station. Signing was very good with lots of traffic free routes right into the town centre. For a pre-meeting ride we cycled out to Etwell along NCN 54 much along an old railway track. At Etwell the route joins NCN 68 the Pennine Cycleway which will take you a hilly 355 miles to Berwick! It was only fairly recently that I became fully aware of the extent of this route. A well kept secret.
Meeting Points
CycleNation
Simon Geller who is the secretary for CycleNation gave some feedback on their recent annual conference in Sheffield. I must admit I had not heard of them before. They are an umbrella organisation for regional campaigning groups. You might want to check them out http://www.cyclenation.org.uk/index.php
Freshairmiles rides
I think there is a general problem in recruiting people onto rides - particularly novice riders. The key learning points from the discussion seemed to be:
- do something other than just a cycle ride - e.g a historical tour
- talk about time rather than mileage
- aa series of rides rather than a one off
FreeRange Kids
Dave Stevens from Sustrans outlined this campaign. It brings together a number of initiatives Sustrans has been doing for a while - "safe routes to schools", "diy streets", "bike it". There was a discussion about how ranger groups can support the campaign. There seemed to be a mixture of top down actions (e.g. policy and campaigning) and bottom up - lobby for a particular local issue (e.g. a cycle path to a local school).
As much as I like Coalville
If you are travelling north on NCN 52 (as I was) and you want to go to Melbourne or Derby and beyond then NCN 52 will work for you taking you from Ravenstone through Coalville, Whitwick and Grace Dieu to meet NCN 6 at Osgathorpe.Thats fine, but not great if you are in a hurry - there are a number of off road sections and it is slow. Using NCN 52 /6 to get from Ravenstone to Worthington (the start of the Cloud Trail) on NCN 6 measures 9 miles. Use minor roads through Sinope, Coleorton and Newbold and the distance come down to just over 5 miles!! Yes there are a couple of quite busy roads to cross, but mostly they are quiet country lanes.
Heres a link to the route in more detail http://ridewithgps.com/routes/783263/ choose the map background to be "OSM Cycle" to see the NCN at the same times.
I'm not suggesting a reroute, but it might be useful to establish this as a route in its own right. What do others think - particularly Joe, Keith
Tuesday, 4 October 2011
Audax first timer

I had an aim this year to do 100 miles in a day - not sure why, but it seemed like a good idea. I knew I didn't want to do it on my own so I started looking around for local events. I found a number of organised Sportive and Audax rides. I struggled to find the difference, but as far as I could establish Sportives were more serious - riding hard and fast and not stopping much and Audaxs more relaxed - plenty of tea and cake stops. So it was an Audax for me.
My son Kevin and I found a convenient 150km Audax starting out of Derby (where he lives) on a gloriously sunny day at the beginning of October. Registration was simple and easy (and cheap) and we were sent a route cue sheet and also a link to a downloadable GPS route. Kevin spent many happy hours with his smartphone / GPS and failed. I went low tech and found a plastic bag, a piece of hardboard, a cable tie and a couple of bulldog clips - fantastic.
We set out from Derby about 8:30 after a welcome tea and biscuits. Just 31 riders - I had expected more. There were 5o for the 100km ride which started a little latter. First stop the cafe at Moira 50km away which we arrived at without mishap about 2 hours later. We stopped here for tea and cakes - very nice.
Replenished we carried on west through Staffordshire and some very pretty lanes and villages to our next stop and check point another 50Km away at Bramshall. All was going well and we were nearly there when Kevin got a "snake bike" puncture on a fast downhill. Spare tube out we thought we would have it changed in 5 mins. Not so - Kevin had deep profile rims and we had short valve stems. After much faffing about we were rescued by a fellow rider who had a spare with longer valve stems - 45 minutes wasted though. We were glad of the next checkpoint to clean up, get some sandwiches and to recount our tail of woe.
Refreshed we set off on the final 50km now heading broadly east back towards Derby. A bit of tricky navigation for a while but well described on the route cards. Then onto Long Lane which was a 10km slog. After this a final few kms back into Derby where we were welcomed with a lavish spread of tea, sandwiches and cakes.
A great day out and one which we will certainly repeat. Everbody was very friendly and very helpful and we were made to feel welcome. Sometimes we rode on our own, sometimes we joined up with other groups, but we did not feel pressured to go any particular pace. At the end of the day we had been in the saddle for almost exactly 6 hours and had taken about 8.5 hours (would have been less without the puncture stop). Because of the cafe stops it felt more like 3 50km rides rather than a 100 mile ride and was easier than I had anticipated. That said we weren't fit to do much afterwards than collapse to the nearest pub for a welcome drink and more food.
If you want to try it out the Audax UK website has a list of events and a map view will show you what is going on near you. http://www.aukweb.net/events/ and here is our 150km route http://www.bikeroutetoaster.com/Course.aspx?course=300955
Thursday, 25 August 2011
Route 52: Coaville 6 São Paulo 5997
The shame at Hermando getting lost on my patch has motivated to improve the signage from Congerstone to Worthington. I've replaced all old-style or vandalised signs. I've put some confirmation signs in after junctions. I've put up 20-odd destination patches, most of which replace existing arrows and tell potential users about what is actually of interest on the route eg. mileage to towns/cities (Derby, Loughborough, Coalville, Nuneaton, Market Bosworth) and visitor attractions (currently Battlefield Centre only.)
I hope we can have a look at signing as a group and see what we can get sorted out.
The 52/63 links pretty much all of the visitor attractions in our area together: Grace Dieu, Snibston Discovery, Battlefield Line, Battlefield Centre, Conkers/Cycle Centre/YHA/Camping, Moira Furnace...we should aim to make people feel that they are on a 'network' which connects these visitor attractions, towns and little villages together. We also need to make sure signing is very clear where routes meet (52/63 and 52/6). Currently, the highways signing only really tells you which village is next. So, I can see why Hermando got lost!
However, our number one priority as a group should be improving the signage to...Belcher's Bar. It is a small hamlet near Ibstock just after the 63 crosses the A511. It does exist, it is on the maps and my Gran confirms that it is called Belcher's Bar. For comedy value, we need to get some destination patches for it ASAP!
Wednesday, 10 August 2011
All towns should be like this
Tamworth seems to have 2 claims to fame. It is apparently the fattest town in the UK (you heard it here first) and it has some of the best cycle facilities I have seen in a town. Clearly the fat people should be getting out and using them. So why was I on Tamworth anyway?
Well as you may have seen on previous posts we are looking to establish a route between Tamworth and Nuneaton. We surveyed the whole route a month or so ago but there were issues getting through Nuneaton and also around the Whateley area outside Tamworth there was a nasty stretch on Trinity Lane adjacent to the M42. So I set off to Tamworth to see if there was a viable westerly route through Dosthill / Whateley area and the answer was yes there is.
I have described the route below, but first a word on Tamworth town cycling. Pick up a copy of the Tamworth cycle map (PDF here) and you are immediately struck by how many green routes there are. These are off road segregated cycle paths that take you around and through the town. Sure some are by the sides of roads, but many are through parks and open spaces. Whats more they interlink, they have good road crossings, are well signed and well surfaced - a delight to cycle.
I have described the route below, but first a word on Tamworth town cycling. Pick up a copy of the Tamworth cycle map (PDF here) and you are immediately struck by how many green routes there are. These are off road segregated cycle paths that take you around and through the town. Sure some are by the sides of roads, but many are through parks and open spaces. Whats more they interlink, they have good road crossings, are well signed and well surfaced - a delight to cycle.
Anyway enough gushing, what about the route?
I have not mapped out the route yet, but with the description below you should be able to follow the route easily on the Tamworth Cycle Map (see link above).
From the station, the route initially follows the cycle path along Saxon Drive before getting away from the road onto paths through the park and past the Snowdome. The route then broadly follows Peelers Way. After crossing Peelers Way the route joins some quiet estate roads for a short stretch before picking up another off road path alongside the River Tame. We then join another quiet estate road again which takes us to Dosthill Park. From here we follow a cycle path along the Tamworth Road, before crossing over the road to take another cycle path alongside Hedging Lane. The end of Hedging Lane is a bit of a pull up, but nothing too bad and the cycle path ends a little before the right turn into Hockley Lane. Hockley Lane leads into Whateley Lane which is a delightful single track lane which takes you through Whateley (a little hilly) and across the M42. A short right / left dogleg takes you across Trinity Lane and you are then on your way to Wood End and Nuneaton beyond.
A good route methinks I would be interested in your views.
Alan
PS If you decide you have to see Tamworth why not take a trip to see the Staffordshire Hoard. Its free, but you have to book. Better still if you are going to Camp Conkers, Shawn will take you there.
Tuesday, 2 August 2011
Into Nuneaton on a bike
This is the proposed route cycling into Nuneaton. From Chapel End it doglegs across the main Coleshill Road (there is a crossing nearby). After the dogleg it picks up Waggestaff Drive (not shown some maps) and uses quiet estate roads to get to Bucks Hill.
Almost opposite is the entry to the off road cycle tracks into Whittleford Park, unfortunately there are 5 or 6 shallow steps to contend with. The (large) kissing gate is not as bad as it first seems. Having read the CTC route description again it looks as though there could be a better entrance a little further up the road - I need to check this out.
There are various tracks through Whittleford Park - I'm not quite sure I chose the right one, but it was very pleasant. There are a few "restrictors" to deal with, but not too bad.
At the exit to the park (by Willow Road) the route joins estate roads towards Nuneaton centre. The proposed route crosses the NCN52 canal section along Vernons Lane, but unfortunately this is only accessible via some steep steps. The canal is however accessible at the next bridge both up and down so I need to check out the links better.
At the end of Fife Street the route crosses a park for a short distance before emerging on Pool Bank Street. A short distance on a shared use path and the route joins the (Roanne) Ringway. A shared use path then goes clockwise around the ringway until you get to Asda rounabout. Here there seems little alternative but to join the main road for the last few hundred yards round to the station.
Coming in the other direction from the station the route needs to be slightly different because of the one way system and has to follow a loop around Regent Street and Back Street. Not great to cycle but there are some shared use pavements and crossings that can be utiled most of the way and it is only a short distance.
So in summary I would say that this is a good route. It is reasonably direct and doesn't have too many crossings. I want to go back and look for a better way in to Whittleford Park and investgate the links to NCN 52. All comments welcome.
Subscribe to:
Posts (Atom)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)












