Thursday, 21 June 2012

Drainage Work on Route 52.


On the morning of Friday the 15th of June, Robert and I ventured out to a section of route 52 – so fortunately placed at his back door – that he had wanted to work on because of it constantly collecting rainwater flowing down the slope, - great for the plant life on both sides but not so for path users. To aid it on its way down we dug through the grass on the downward slope at key points, with the effect being noticeable almost right away. Now the water drains much better, although it’s probable the makeshift drainage ditches will soon be filled with vegetation, making this something to be repeated on a fairly regular basis. Robert also cut back thorny plants such as blackthorn and dogs rose that had begun to encroach on the path.


Once that was completed, we followed route 52 to Gracedieu Priory so I could learn more about the route and Sustrans in general. The trail seemed well managed, though just as it reaches the turn-off to the priory and the end of the woodlands a tremendous rotten branch had snapped off an Ash tree, presumably in the previous nights storm, taking with it a fair deal of neighbouring Sycamore branches. Being too large to move and blocking the path almost entirely, attempts were made to report it, - it will not be long before removal.

All in all, a productive day and the route has been improved somewhat. A crying shame, though, that the sporadic downpours were not avoided. 


Tuesday, 5 June 2012

NCN52 Weddington Way – Inspection Ride


On 05th June 2012 I performed an inspection ride of NCN52, between Higham-on-the-Hill and Attleborough, Nuneaton. The ride was dual purpose; 1, to check the state of the Weddington Country Walk / Coventry Canal off road section and 2, to perform a reconnaissance ride of the braided section of the route that passes through the town centre. The latter was to make recommendations for possible renumbering, as per current SUSTRANS practice concerning split or braided routes.

My findings were as follows:

A.      The Weddington Country Walk (WCW) is overgrown in two places:

1.       Weeds are crowding the path in places between the A5 and A444.

2.       Where the path near Sandon Park becomes very narrow, Hawthorne & Nettle are growing through the fence on both sides, making riding quite hazardous

B.      There is a lot of damage to signage (see photographs) along WCW thus:

1.       Reminder sign damaged at farm track over bridge near A5.

2.       Damage to “Busy Road” warning sign near A444.

3.       Signs damaged or completely torn away at Sandon Park.

4.       Graffiti over sign on Stoney Road.

5.       Signs damaged at entrance to Coventry Canal – Midland Road.

C.      The Railtrack improvements and diversion of railway lines, means that the Stoney Road area is in a state of constant flux and will be for a considerable amount of time. This will cause requirement of frequent updates to signage.

D.      There is very little signage along the Coventry Canal in either direction, this requires rectification. Signs that are in place are damaged or covered with graffiti.

E.       The signage of the “alternative” braided route, via Nuneaton town centre is rather sporadic and ambiguous running in a Southwest direction; running Northeast, some of the signing is almost non-existent.

F.       At Pingles Park (The Wem Brook Trail) the white “National Cycle Network” direction signs (as shown in Photograph 6) have all suffered damage, most missing at least 1 arm some having none.

I conclude that the on road route via Nuneaton town centre, is possibly the more viable route to sign as route 52. I suggest that the route via Weddington Way, Sandon Park, Stoney Road and the Coventry Canal could be renumbered as NCN (52) or (52A) or Regional Route RCN (52) or (52A). This should be applicable between where the route diverges at the A444 Weddington Road and where it reconverges, with the Coventry Canal at the Shepperton Business Park. This option will require less expenditure for replacement of signs.

I am prepared to perform some of these corrections, between Higham-on-the-Hill and Shepperton Business Park, but I also think that the Nuneaton group should have a chance to share in the improvements.

Kev Regester – West Leicestershire Ranger – NCN52 Weddington Way






Freshairmiles - quality not quantity!


We ran two social rides out of Hinckley on the evenings of Monday 27th May and Mon 4th June. Our target audience was specifically a group of adults who had just completed cycle training courses run by Leicestershire Council. The idea was to provide a social activity and introduce them the local network of lanes so that they could try out their new skills in a safe environment.

I publicised the rides by turning up at two of their cycle training evenings, talking to them about Sustrans and the planned rides and also handing out contact details and flyers for the rides. There seemed to be a fair amount of interest albeit that there were probably only 10 or so regular participants. We did not publicise the rides any wider in fairness.

Unfortunately the interest did not translate into people turning up for the rides on what turned out to be two of the better evenings for weather. The weather for the first ride was glorious.

So we had just Tina along for the first ride and she was joined by Judy for the second ride. In the end the other planned ride leaders were "stood down" and I took the ladies out on my own. On the first night Tina was keen to go further so we extended the planned ride and did an extra loop out to Shenton station - probably 15 miles in total. The second night was a bit cooler so we contented ourselves with the planned loop out to Dadlington and Stoke Golding stopping for a well earned drink in the George and Dragon. The ladies said they enjoyed the rides and I certainly did. Both of them intend to continue with their cycling so thats great.

This is now our third year of running freshairmiles rides and we have still not cracked how to get joe public along. I am tempted to get myself trained as a Skyride leader next year and go down the skyrides local route - they have a bigger marketing budget than Sustrans!

Sunday, 22 April 2012

NCN524 Blaby to Higham-on-the-Hill – Test Ride

A few souls (with nothing better to do) met up in Blaby, at 0930 on Sunday 22nd April 2012. Our Objective: to test the viability of this route, as a new part of the National Cycle Network, linking some parts of South-West Leicestershire, that until now, had been overlooked.
Those Present:
James Lowe, Alan White, Eric Ludlow, Robert Robinson, Jack Riggal and Myself.

I think that everyone enjoyed the ride and the general consensus was that this was a good, viable route, to add to the network. The weather stayed on our side for most of the way, only turning bad on us with a brief downpour, near Wykin, close to our Journey’s end at Higham. Even then Jack scared the weather into submission by donning his waterproofs.
The journey went pretty much without incident, apart from maybe two points to mention:
1.       The gradient around Croft Hill, beat me, forcing me to get off and push, much to my shame, considering all of my counterparts managed it, several of them carrying more senior years than I.
2.       Despite much cajoling and multiple pleas, Eric was adamant in his refusal to perform any stunts at the Watery Gate Lane ford, near Thurlaston. A missed opportunity methinks, especially considering an almost captive audience.

The trip was approximately 16½ miles, only slightly over my estimate and took just less than 2½ hours. We did identify some areas that require attention, as the route develops, listed thus:

Infrastructure Alteration Requirements
1.       Whetstone / Blaby
Grove Road & A426 – Blaby By-Pass Roundabout
i.                     Footpaths need upgrading to Share use Pedestrian & Cycle paths, all around the roundabout, to allow safe negotiation of junction by pedal cyclists.
 
2.       Narborough
Coventry Road, B4114 – King Edward Ave & Huncote Road
i.                     Divert cyclists onto Northern pavement (upgraded to shared use) on Coventry Road, between Cedar Crescent and King Edward Ave.
ii.                   Upgrade Pelican Crossing to Toucan Crossing.
iii.                  Upgrade Western pavement of B4114 – King Edward Avenue to shared use Cycle/Footway, between Toucan Crossing & Huncote Road.
iv.                 Continue shared use Cycleway, into Huncote Road (on Northern pavement) until Just before car parking lay-by.
v.                   Install appropriate signage, on roads, pavements and posts, informing cyclists where to leave or rejoin main carriageway, at these alterations.


3.       Hinckley
Barwell Lane, B4667 – Ashby Road & Barrie Road
i.                     B4667 – Ashby Road; Eastern pavement – Upgrade to shared use, between Barwell Lane & pedestrian crossing.
ii.                   Upgrade Pelican Crossing to Toucan Crossing.
iii.                  B4667 – Ashby Road; Western Pavement – Upgrade to shared use, Toucan crossing and Barrie Road.
iv.                 Install appropriate signage, on roads, pavements and posts, informing cyclists where to leave or rejoin main carriageway, at these alterations.

A very big thank-you to Alan, for providing refreshment and an excellent chilli to round off a very pleasant day.
Kev Regester
West Leics Sustrans Ranger
NCN52 (Weddington Way)

Sunday, 1 April 2012

Ride out to Loughborough

Sad I know, but I had been fascinated by the Loughborough Cycle map which shows a number of numbered cycle routes through and around the town. On a lovely spring day myself, Eric and Robert took a trip out to Leicester via NCN 63 and then NCN 6 north to Loughborough. A couple of problems following 63 which has quite a few twists and turns but we got there without any real problems. We then picked up NCN 6 which was more straightforward and has recently had some posh new signs.

Refreshment stops at the Abbey Park cafe and then a well earned pint at a canalside pub in Loughborough which went down very well.

From here we headed off in different directions for home - me a hilly ride through Charnwood fo
rest and Eric tried the towpath. Robert opted for NCN 6 / 52. Before we split Robert and I followed a part of Route 3 from the pub. This looks like a bit of a ring road around the town. Anyway it delivered me from the pub to the Uni where I picked up the road to Nanpantan The route was well signed and the cycle route was all on dedicated cycle paths by the side of the road.
Bit tired by the time I got home, but a great day out.

Thursday, 29 March 2012


Sunday 25th March was a beautiful day for our workday on NCN Route 52 in Gracedieu woods in Thringstone, Leics.  Our work party of 7 consisted of Eric, Shawn, Ben, Kev, myself (Robert), ably assisted by Jack (a new volunteer) and my son Alex.  I arrived by car at about 10 15 am  with a trailer full of wheelbarrows, spades, shovels and sweeping brushes,  some of them had been borrowed from kind neighbours.  I quickly set up notices informing the public that work was being done on the path.
As soon as the volunteers arrived  we set about trying clear a section of an old railway cutting (originally the Nuneaton to Loughborough line) -  about 230 metres need to be cleared of collected debris. This consisted of leaves which had by now composted down, an ideal growing ground for the blackberry bramble (the cyclist’s favourite bush - anyone who has caught one in the crook of their arm riding at speed knows why they are favourite!)   In total we managed to clear about 150 metres, removing 100+ barrowloads of  assorted debris - brambles, old bits of branches etc.  We increased the narrow path back to a comfortable 2 - 3 metre width, finishing at 1.00pm - not a bad morning’s work.



I was pleased at this point to depart to a local hostelry as I was feeling somewhat tired and in need of refreshment; I don't know how those helpers who had cycled to Thringstone summoned up the energy to ride home, as they had already cycled in for about 1.5 hours. Kev - who had been transported by car to the work site and then unloaded his bike and trailer, intended to make the return journey by bike which apparently would take about 3 hours. Thanks very much to you all, a great effort and I am sure that this will be appreciated by all who use this route.
Footnote: several local residents commented on the day that they were pleased to see the clearing work being done, as this is a very popular section of route 52 and well used by both cyclist and walkers.
thanks again to all involved.
Robert ROBINSON Ranger on NCN 52, 6, 15 Coalville to Wilson